AKS furnace equipment shipment

Send Your Strip Data to AKS.

Material, strip range, target speed, hardness, utilities and floor space together define looper type, furnace length, heat source and cooling capacity.

Project Inquiry

Start with the key constraints.

Existing line issues, target output, strip specifications or utility conditions can all start the discussion. AKS first screens the furnace direction, then moves into drawings and quotation.

Contact

Eric Tian
General Manager

Data Checklist

These details speed up the first screen.

The earlier material and site conditions are visible, the earlier space, utility, cooling and process risks can be identified.

Strip Specifications

Material grade, strip width, thickness range, coil weight, coil diameter, target hardness and surface finish.

Line Targets

Target speed, monthly output, continuous running requirement, current bottlenecks and recurring defects.

Site Conditions

Plant length, width, height, power supply, gas/LPG condition, atmosphere supply and environmental requirements.